We’re delighted to have been appointed as the specialist preparation contractor to carry out the concrete preparation works to the top and split-level decks of the multi-storey car park at Addenbrooke’s Hospital, Cambridge.
The existing top deck waterproofing to the car park was laid some 15 years earlier and the waterproofing system had exceeded its performance life. The decks were shot blasted by way of dust captive blasting to remove the existing waterproofing system and top leaving a clean, keyed surface ready for the application of the new waterproofing. The selected system was Tremco’s car park deck waterproofing system.