Completed Car Park Floor Finish at Lonza

Lonza Multi Story Car Park Flooring

Specialist contractor Flowstone Industrial Flooring Limited was appointed to apply a car park coatings system to the top deck, the intermediate deck and the stair cores of a newly constructed multi-storey car park. The facility was constructed primarily to provide car parking for the staff at Lonza Biologic’s UK site in Slough.

Read More

Multi Story Car park Surfacing

Multi Story Car park Surfacing

Flowstone Industrial Flooring Limited were pleased to be re-appointed to carry out the liquid applied coatings and waterproofing works to the multi storey car park at Warwick University, during a planned 5-week programme.

Read More

Car Park Treatment

Car Park Coating Completion at Southampton Docks

The main challenge the project posed was that the multi deck car park is an external structure and the specified system, as with all resin based systems, could only be applied in dry conditions, this combined with a wetter than usual summer and the imminent arrival of made to order luxury cars for export meant working to tight schedules.

Read More