In 2016 Flowstone was delighted to complete works at Carrington Power Station – a 880MW combined-cycle gas-fired plant, which was developed on a 23ha site in Manchester. We were contracted to supply and install the resin flooring and wall coverings to a number of areas within the plant, including water treatment buildings, chemical waste storage, and dosing areas.